
Nesse Solar park
Green collaboration with committed landowner
Nesse Solar park will produce a total of 11,2 MWp, giving the power grid an extra 10,2 GWh annual boost. The future solar park will contribute to the establishment of renewable power supply in Vestland, as part of the development plans for the county.
The respective landowner took an active role, in the crucial planning stage of the project. Ensuring a sustainable balance between two important industries, agriculture and power production. This area will be shaped to combine solar power production, and green pastures with grazing livestock, in the near future.
Progression:
- Concession application sent to NVE, January 2024
Visualization depicting Nesse Solar park
Press:
- https://www.europower.no/solenergi/satser-pa-sauer-og-sol-i-sveio-haper-pa-konsesjon-til-sommeren/2-1-1585525
- https://vestavind-sveio.no/2024/01/04/hapar-solenergi-kan-gjera-han-til-heiltidsbonde/
- https://vestavind-sveio.no/2024/01/04/sol-og-sau-i-sveio/